Second floor started

 We finished cutting the last door, so we are ready for second floor 4x10x16' beams. Well over 200 lbs each I think.


Jessica and I carried 6 inside, and started planing and sanding.

Used a chain hoist to get them up on the girder logs (1 person job if you're careful).

First two are up and so far everything is level.






Comments