almost ready for plumbing

Image
 Been finishing up framing, just have a small section to close in downstairs shower with a wall and frame a door under the stairs. Jessica sanded more logs and they look great. Also got a crawlspace access door cut into the floor with hinges.

Upstairs almost done

Image
 We finished the last of the t&g on top of the beams, then topped with 3/4" subfloor, super sturdy and solid now. Built a set of stairs, still need to close them in underneath for pantry/storage. Started framing upstairs this weekend, got the bathroom and bedroom almost completed. Just need  to finish up to the ceiling.   Jessica sanded a bunch of logs in the laundry room area, they are nice and smooth now.   Layla was also helping today, she needed the heater.  

Windows in, first floor framing done

Image
 We finished the last of the windows downstairs, patio door installed, and all first floor framing done  Started second floor tongue and groove. Making good progress: