Flooring, chinking, stairs, vanity

Image
 Chugging along. We have the kitchen cabinets ordered and should be ready in a couple weeks.  Picked a different bath vanity and sold the other one . Chinking in bedroom finished, and flooring done too through bedroom and closet. Also did all the flooring up the stairs, and wired some low voltage lighting in the stringers. And have trimmed out some doors and a little baseboard work done.

Getting more done

Image
 We finished tiling the master bathroom, floor and entire shower.   The kitchen lighting(LEDs and island pendants) is installed along with the the mud room light.      And we started the flooring downstairs.  

Happy new year update

Image
 We worked hard leading up to the holidays to get the upstairs finished, so Mom and Dad had a place to stay when they came down for new years. Got the stair railing done, and hardwood installed upstairs. Pocket doors trimmed, Jessica did all the door casing and baseboards, cutting and installing and painting! After Christmas, we had a few very productive days.  Dad helped me finish more flooring, modified the converted dresser shelves to fit around the plumbing , and did a lot of log check sealing. Mom helped Jessica do a bunch of painting. We also finished tiling the powder room wall, installed some lights and the last ceiling fan and some misc electrical stuff, plugs almost all done. Started the prep work for tile in the master bathroom this weekend.