Ready for backfill
We've made decent progress, after the ICF blocks were set we braced the inside walls, finished the rebar, and added knockouts for plumbing out and dryer vent. Also added conduits for water in, electric in, house bibs at 2 corners, and a couple extras just in case.
Concrete pour went ok but had 1 blow out at a cut block so that was stressful but we got it stopped.
Added 4" perforated pipe for drainage all the way around and the waterproof membrane.
Should be backfilling this weekend!
Comments