Backfill is done

 We filled in around the foundation now that the waterproof membrane and drain was installed. Even though we filled the holes, our dirt pile is larger again:)


We will push over 2 mid sized trees and make the parking area larger with the extra dirt.


Also found a massive boulder that was flat on top, have to turn that into something useful once we are done.





Comments

Popular posts from this blog

Second floor 4x10's done and a few windows

Interior clear done

Progress again