Passed inspections

 We pulled in our own AC cable from the meter base up to the house, that was fun! took some good pulls.

Finished up the panel working and grounding, and passed our rough in.  We also passed the mechanical rough in(bath fans, dryer vent, wood stove ceiling box), and then passed rough framing.


So now we are insulating, then drywall soon. Also 3 outside walls done chinking.





Comments

Popular posts from this blog

Kitchen almost done!

Board & Batten started