The hardwood flooring is all done finally, haven't taken a decent picture because it needs the dust cleaned off :)
We also scrubbed some more chinking off the logs, only a closet to go, then it's all done.

I started the kitchen backsplash today after cleaning a bunch of garbage out of the front of the yard.
Put in the last 2 electrical boxes, then installed some 2x4 blockings, and put up the cement board (Durock).


We had about 2 extra boxes of tile from the kitchen floor, so we cut them down to 4x4 tiles & planned to use those. The tiles weren't the same size, & after the first row I could tell it just was not going to look good. We pulled them off & cleaned the mortar off.

Will be buying some other 4x4 stone to put up instead. Will hopefully get this finished up after work, by then our stair railings should be in.