October 21st, 2007 : Setting center RPSL
We set the middle girder & RPSL today.
The middle one is bolted to the girder log, & they'll all be tied together once the ridge pole goes on.
The outside ones are bolted to the log walls.
The middle one is bolted to the girder log, & they'll all be tied together once the ridge pole goes on.
The outside ones are bolted to the log walls.
Comments