We finished getting all the 4x10's up on the girders, leveled, and secured. Also installed another 3 windows, the two fixed pane in the living room are in, and the slider in the kitchen as well. The next ones and the patio door I'll need Jessica's help with, too heavy to do alone. Cleaned up a little as it was getting messy . Not too far from starting interior wall framing!!
Busy weekend; the interior finish is complete!! We decided to do a clear satin finish. Each log is so unique we felt this would bring out its natural beauty. Lots of work to get them ready for this weekend. - Powerwash 3x - grinded all logs with flap disk - palm sanded inside (60 grit) - scrubbed with cleaning solution - applied a brightner - coated logs in borate (keeps the bugs out!) - applied Pre-Stain #sashcocolorfast - sanded between each coat of clear. We couldn’t be happier! The logs have a soft, smooth texture with a luxurious sheen. Exterior stain this weekend!
We pulled in our own AC cable from the meter base up to the house, that was fun! took some good pulls. Finished up the panel working and grounding, and passed our rough in. We also passed the mechanical rough in(bath fans, dryer vent, wood stove ceiling box), and then passed rough framing. So now we are insulating, then drywall soon. Also 3 outside walls done chinking.
Comments